Bear Run Lead Track

Kolb Grading, LLC was awarded a contract to perform clearing and excavation at the Bear Run Lead Mine in Dugger, Indiana.

  • 800,000 cy Excavation
  • Over 100 ac Clearing and Grubbing
  • 30,500 tons Place and Compact Shot Rock
  • Furnished, Hauled, Placed and Compacted 1,600 Tons Rip Rap
  • Over 4,000 lf Corregated Steel Pipe Install
  • Remove Track and Stockpile
  • Contech Conspan Bridge
  • Mainline Access Road and Fencing
  • Used Mine Waste to Create RR then Capped
  • Lime Stabilization
PROJECT INFO
Client:
The Indiana Railroad Co
KG’s Role:
General Contractor
Location:
Dugger, Indiana
Contract Value:
Undisclosed