Kolb Grading, LLC was selected by Clayco to perform grading and foundation
preparation for the Coleman building in Gardner, Kansas. Project features:

  • Clearing and Grubbing over 38 Acres
  • 500,000 cy excavation; Importing and Placing Screenings
  • 1,000,000 sf Subgrade Building Pad
  • Subgrade Parking Lot; Soil Stabilization and Lime Slurry
  • Silt Fence Installation and Maintenance
  • Over-Dip for Retaining Walls; Haul Off 7,888 cy of Utility Spoils
  • Survey and Layout; Temporary Construction Entrance
PROJECT INFO
Client:
Clayco
KG’s Role:
Subcontractor
Location:
Gardner, Kansas
Contract Value:
$4.2 Million