Nederland, Texas work was performed for the Enbridge Pipeline. The
scope of work:
- Strip Topsoil; Scarify and Re-Compact
- Undercut Building Pad and On-Site Cut
- Lime Stabilized Subgrade
- 30,000 sf of HDPE 60 Mil Liner Installation
- Import, Place and Compact
- Flared End and Concrete Toe
- Employee Certification and Safety Awards