Part of the Lambert International Airport Expansion contract included significant
cast in place structures:
- 28,000 lf of Storm Sewers Ranging from 15” to 84” RCP
- 86 Design-Build, Aircraft-Loaded Cast-In-Place Structures
- Modification to Contract for 55’ Tall, Cast-In-Place Storm Structure
- Work Was Reassigned from Other Contracts
- 500’ 8 x 21 Cast-In-Place Box Culvert
- 1,600 sy Paved Swale
- Worked Within Airfield Operations Area (AOA) and Around Existing Airfield Maintenance Facility
- Mitigated Drainage Problems Created by Other Contractor’s Performance
- Sequencing Installation of New Utilities; Abandonment of Existing Utilities