Indiana US Interstate 69

Kolb Grading, LLC worked on three contracts as part of Phase 5 of I-69
Construction. Some of the project features:

  • Installation of Wick Drains
  • Over 10,000 ft Storm Sewer Installed
  • Installation of Boxes Ranging from 36” to 12’ x 6’ Boxes
  • 40 ac Clearing and Grubbing
  • 530,000 sy of Geotextile
  • 10,360,000 cy Unclassified Excavation
  • Class C Excavation
  • Over 500,000 Tons of Base Rock Installation
  • Over 145,000 Tons Soil Stabilization
PROJECT INFO
Client:
INDOT
KG’s Role:
General Contractor
Location:
Greene Co, Indiana
Contract Value:
$175 Million