Lake St. Louis Pump Stations for PWSD#2

Lake St. Louis Pump Stations

Kolb Grading, LLC was selected by St. Charles County Public Water Sewer District No. 2 and Hansen Engineering to perform sanitary improvement to local pump stations. Job Safety Analysis was required for every task:

  • Precision Drilling for Wet Wells
  • Erosion Control with SWPPP Enforced
  • Clearing and Demolition of the Existing Pump Stations
  • Electrical, Mechanical, Pavement
  • Seeding and Sod
  • Retaining Wall
  • Control Building Install and Force Main
  • Connection to New Pump Station
PROJECT INFO
Client:
Public Water Sewer District
KG’s Role:
General Contractor
Location:
Lake St. Louis, Missouri
Contract Value:
Undisclosed

Related Projects