Lindbergh Boulevard Tunnel

Lindbergh Boulevard Tunnel

During the performance of our work on both North and South Bypass, Kolb Grading, LLC was awarded this project from McCarthy. The scope of work included:

  • Backfill of 0.5 Mile Long Cast-In-Place Tunnel
  • 96,000 sy Geotextile Fabric
  • 24,000 cy of Type 1 Crushed Stone
  • 100,000 cy of Type 4 Crushed Stone
  • 100,000 cy of Lime Stabilized Soil
PROJECT INFO
Client:
McCarthy
KG’s Role:
Subcontractor
Location:
Bridgeton, Missouri
Contract Value:
$4 Million

Related Projects