Kolb Grading began providing services in maintaining the plant’s fly ash pond in 2005. KG took the initiative to develop and implement a strategy to keep the plant operational and generate several hundred thousand cubic yards of fly ash used throughout the plant for various projects:
- Created a Main Haul Road through the Pond with Bottom Ash
- Installed Pipes to Allow Water Flow and Level Control
- Created Deeper and Wider Channels; Excavated and Dried Fly Ash, and Its Weight Consolidated the Underlying Fly Ash
- Excavated, Dried, Hauled and Placed Over 300,000 cy of Dry Fly Ash from Pond to Fills
- Constructed a 53,000 ft Haul Road to Support Scrubber
- Improvements 600,000 cy Excavated from Fly Ash Pond