Kolb Grading was selected by Freise Construction to perform grading and foundation preparation for the school site. The work included clearing and grubbing more than 4 acres, 88,550 cubic yards of excavation, subgrade building pad and parking-lot preparation, limestone screening, and soil stabilization with lime slurry, along with silt fence, survey and layout, and a temporary construction entrance.
Scope of Work
- Clearing and grubbing more than 4 acres
- 88,550 cy excavation; subgrade building pad
- Subgrade parking lot
- Limestone screening
- Soil stabilization and lime slurry
- Silt fence installation and maintenance
- Survey and layout; temporary construction entrance

