Iowa Fertilizer Plant

Kolb Grading, LLC was selected by Winger to perform the water main extension
at the Iowa Fertilizer Plant. The project consisted of strict guidelines and a tight
schedule satisfied by Kolb Grading:

  • Water Main Extension with HDPE Pipe
  • Excavate and Install over 32,000 ft of HDPE Pipe Ranging from 24” – 30”
  • Installation of 44 Thrust Anchors
  • Clearing and Grubbing
  • Private Land Excavation and Restoration
  • Road Crossings and Ditch Install/Maintain
  • Wetland Protection
  • Fire Hydrant Assembly and Installation

PROJECT INFO
Client:
WINGER COMPANIES
KG’s Role:
Subcontractor
Location:
Wever, Iowa
Contract Value:
Undisclosed

Related Projects